1.
Stage at the nearest hydrant and prepare to lay-in a 5-inch supply
line to the scene.
2. Lay-In the primary: 5-inch supply line from the nearest hydrant;
position by R-1 (unless ordered otherwise). Angle pumper across lane to
block traffic and protect the pump operator and other firefighters. Turn
off headlights and direct flood lights to avoid blinding on-coming
motorists.
3.
Specific Engine Company Tasks:
a. Supply water to R-1 by a
3-inch line.
b. Advance 2-inch attack line(s)
as needed, equipped with and using SCBA.
c. Commence search operation,
equipped with SCBA.
d. Lay a blanket of protective foam if large volumes of
flammable liquids are involved or at risk.
e. Protect exposures, as necessary.
f. Contain any fuel spill,